Intake control

Material safety and job acceptance.

The customer remains responsible for declaring the component history and presenting it in a condition safe for normal workshop handling. RDB performs an intake assessment but does not operate as a hazardous-waste treatment facility.

Safe intake

Minimum intake requirements

01

Declare the service history

State the machine, process, material and operating environment in which the component was used.

02

Drain and clean the component

Remove product, liquid, sludge, dust and loose deposits. Cleaning must not hide damage or identification markings.

03

Provide supporting information

Provide an SDS, cleaning certificate, radiation survey or other evidence when the source or exposure requires it.

04

Wait for intake approval

Do not unload a suspicious or undeclared component. RDB may request inspection outside the normal receiving area.

Safe intake

Acceptance guide

This guide supports initial screening. Final acceptance depends on the actual condition and disclosed history.

Component conditionRequired action
Clean industrial rotor with known historyNormally accepted subject to normal inspection.
Oil or grease residueDrain and clean before delivery. Minor normal film may be assessed at intake.
Known hazardous chemical exposureDisclose the chemical and provide the current SDS and decontamination information before delivery.
Biological, sewage or decomposing material exposureProvide evidence of suitable cleaning or decontamination before acceptance.
Suspected asbestos-containing materialNot accepted without independent clearance acceptable to RDB.
Suspected radioactive contaminationDo not unload. Specialist clearance or a suitable radiation survey is required.
Sealed, pressurised or trapped-energy componentDepressurise, isolate stored energy and declare the condition before delivery.
Explosive, pyrophoric or reactive residueNot accepted for normal workshop intake.
Unknown previous service or uncertain contaminationHold delivery and contact RDB for a risk review before transport or unloading.

Customer declaration

Prepare the material safety declaration.

Complete this before delivery. The generated summary can be copied, printed or saved as PDF and later attached to the job record.

!

This declaration supports intake screening but does not remove RDB’s right to inspect, isolate or reject the component.